The lighting towers packed on pallets, before delivery

Projects and deliveries

We specialise in delivering products and equipment for any kind of project.

  • deliveries with photographs
  • project fields
In focus · 202553 X-ECO 4x320W lighting towersScroll into the delivery
X-ECO lighting towers lined up on mobile platforms
01 / 04Each unit stands on its own two-wheel platform with a towing system, so it can be moved between work sites without extra machinery.
Rows of lighting towers before the second batch
02 / 04The delivery came in three batches: 20 units in mid-June, 20 at the end of the month and 13 in the first days of July.
Telescopic tower raised, with the four LED floodlights mounted at the top
03 / 04The hydraulic telescopic mast rises over 8 metres. The four 320 W LED floodlights are mounted on it.
Detail of the floodlight block of an X-ECO tower
04 / 04The tank of over 100 litres gives more than 200 hours of running time — the equipment is made for building sites and areas without a grid connection.

Technical equipment · Documented delivery · 2025

53 X-ECO 4x320W lighting towers

Delivered in three batches and completed more than five months ahead of the contractual deadline.

Floodlights
4 × 320 W LED per unit
Mast
Hydraulic telescopic, over 8 metres
Tank
Over 100 litres
Running time
Over 200 hours of operation
Contractual deadline
End of 2025
Actual handover
Early July 2025
See the delivery

Medical and laboratory · Documented delivery

Axolotl Biosystems AXO G3 bioprinter

A 3D bioprinter for cell- and protein-based structures, delivered and commissioned in a research laboratory together with its consumables.

Technical sheetAXO G3

01Manufacturer
Axolotl Biosystems
02Model
AXO G3
03Printheads
3 slots, heated head
04Print chamber
Enclosed, LED lighting, HEPA filter
05Sterilisation
Integrated UV-C lamp
06Pressure control
3 independent channels, digital readout
07Interface
Touchscreen, saved protocols
08Emergency stop
Button on the front panel
See the delivery
The AXO G3 bioprinter installed on the laboratory bench, with its consumables beside it

01 / 07The equipment installed at the buyer's site, with the stock of Axolotl Biosystems consumables delivered with it.

All deliveries

The deliveries we can show in photographs: two documented step by step, the others told in our articles.

Describe the project

What needs to be delivered, in what quantities and by when. We prepare the offer based on that.