INOVUM SRL responds to the articles in Gândul, ecoPOLITIC and BZI about the “4-million-euro aircraft”
Exercising our right of reply, we respond to the three articles that contain the same erroneous and disparaging statements about INOVUM SRL
With this reply, we intend to clarify the facts concerning the award procedure and the subsequent cancellation of the public tender for the purchase of the aircraft for the Ministry of the Environment. At the same time, we wish to refute certain erroneous statements that seriously harm the image and reputation of our company.
1. Who launched the tender
The articles claim that the former Minister of the Environment, Diana Buzoianu, launched this public tender.
In reality, procedure CN1080568 was published in SEAP [the Romanian electronic public procurement system] on 25 April 2025. At that date, the Minister of Environment, Waters and Forests was Mr Mircea Fechet. Ms Diana Buzoianu took over the ministry only in June 2025. The previous tender for the same aircraft, estimated at 72.5 million lei, was cancelled, as confirmed by the current Minister of the Environment herself, Ms Natalia Intotero.
2. The amount
The articles give “the sum of 19.92 billion lei (approximately 4 million euros)” as the value of the contract.
In reality, 19.92 billion lei means almost 4 billion euros, not 4 million. The estimated value of the contract was 19,920,000 lei excluding VAT, and INOVUM’s bid was 19,900,000 lei excluding VAT. An error by a factor of a thousand, repeated in three articles about public money, shows how carefully the information was checked.
3. The sale of aircraft
The articles claim that INOVUM “does not deal in the sale of aircraft”.
The certificate issued for INOVUM SRL by the ONRC [National Trade Register Office] lists, as an authorised activity, CAEN code 4614 – Agents involved in the sale of machinery, industrial equipment, ships and aircraft. The company has also taken part as an aircraft supplier in other public procedures, including the previous tender of the same ministry, which was later cancelled. An aircraft supplier does not manufacture aircraft itself, just as a car dealer does not produce the cars it sells. The aircraft was to be delivered by its manufacturer, through INOVUM. It is a high-performance aircraft, economical in terms of both price and fuel consumption, used for the same purpose by institutions and companies in several Member States of the European Union.
4. “Four employees and 9.8 million lei in turnover”
The articles claim that INOVUM supposedly holds a “season ticket” to state contracts.
The qualification requirements of the tender – turnover, similar experience and guarantees – were set by the ministry and verified by the evaluation committee. INOVUM met them. Otherwise it would not have been declared the winner. The procedure was open and published in SEAP, and any company from the European Union could take part in it. INOVUM’s bid was the only one submitted, and it obtained the maximum score of 100 points. In the previous, cancelled tender there were several bids. Over the years we have delivered to institutions led by people from different parties, because tenders are won on the strength of documents, not of political affiliation.
5. Rejection by the European Commission
The Commission allegedly rejected the aircraft because it “would have polluted excessively”.
In fact, none of the articles presents any document from the European Commission. Moreover, the current Minister of the Environment herself stated publicly: “We do not have an official document from the European Commission” and “We do not know the reason why this aircraft […] was removed from the PNRR” [Romania’s National Recovery and Resilience Plan]. The former minister explained that the aircraft was removed “together with dozens of other projects which the Commission believed could no longer be completed”, that is, because of the deadlines, not because of the environment. No official source supports the statement about pollution. We publicly request that the document on which this statement is based be published.
The aircraft was meant to collect LiDAR and photogrammetric data for forest monitoring, that is, precisely for the protection of the environment. The airborne LiDAR sensor, worth 22 million lei, has already been purchased with PNRR funds and is awaiting an aircraft on which it can be mounted.
Aircraft of this type have also been purchased with European funds in other Member States:
| No. | Country | Who bought what | Funding |
|---|---|---|---|
| 1 | Greece | Fire service: 3 aircraft (the type offered by INOVUM) | The Recovery and Resilience Facility, through “Greece 2.0” |
| 2 | Poland | OPEGIEKA: aircraft (the type offered by INOVUM), with a hybrid photo and LiDAR sensor | ERDF. A project 60% funded by the EU |
| 3 | Germany | TU Dresden: aircraft (the type offered by INOVUM), a flying laboratory for “climate” aviation | Mainly from the EU Just Transition Fund |
| 4 | Hungary | Military mapping, HM Zrínyi: aircraft (the type offered by INOVUM) with LiDAR, delivered in March 2025 | EU funds, but through a procurement mechanism via the army’s foundation. |
6. “The procedure continued for 11 months without money”
From the outset, the tender documentation contained a suspensive clause relating to funding. This is a lawful practice, known to all bidders. INOVUM was declared the winner on 14 May 2026, with the maximum score of 100 points (notice UIPSCL/114671/14.05.2026). Since then, the company has maintained its bid and its guarantees, at its own financial risk, and has asked in writing, on four occasions, for the contract to be signed and for a meeting:
| Letter | Date | Reply | Registration number |
|---|---|---|---|
| First letter | 29.05.2026 | No reply | No registration number |
| Second letter | 09.07.2026 | No reply | R 32605/09.07.2026 |
| Third letter | 14.08.2026 | No reply | R 39474/17.08.2026 |
| Fourth letter | 12.10.2026 | No reply as of 05.11.2026 | R 48026/12.10.2026 |
The letters were submitted both as petitions, under Government Ordinance no. 27/2002, and as requests for information of public interest, under Law no. 544/2001. The ministry did not reply to any of them. For the letters registered in July and August, both the 30-day deadline under Government Ordinance no. 27/2002 and the deadlines of 10 days and, at most, 30 days under Law no. 544/2001 have long since expired.
On 2 November 2026, at 16:31, on the same day the first articles appeared, the ministry cancelled the procedure in SEAP. As of the date of this reply, INOVUM has not received the statement of reasons for the cancellation, which public procurement law requires the contracting authority to provide. The next day, the minister stated publicly that the procedure had been “put on hold until we find a source of funding”, although in SEAP it already appeared as cancelled.
Our requests:
- Gândul, ecoPOLITIC and BZI should publish this right of reply in full, each with the same prominence as the original article.
- Gândul, ecoPOLITIC and BZI should correct the headlines and statements that do not correspond to the public documents.
- Antena 3 CNN, the source cited, should present the documents on which it relied.
- The Ministry of Environment, Waters and Forests should communicate the reasons for cancelling procedure CN1080568 and publish the document by which the European Commission allegedly removed the aircraft from the PNRR, if such a document exists.
ing. Köteles Dieter
Administrator, INOVUM SRL
Oradea, 05.11.2026




